HETC
Hyper Energy Technologies
Corporation®
systems for Pennsylvania
Manufacturing 24/7 clean energy systems for Pennsylvania
The Challenge
Beyond Daylight Energy
reliability and resilience problems for Pennsylvania communities.
The Problem
No locally manufactured 24/7 panel that works in night, rain, snow, or low-irradiance conditions in Pennsylvania.
The Solution
Manufacturing pilot line for FluxSolar™ 24/7 panels and Quartz Resonant Battery™ modules in Pennsylvania.
The Location
239 Fourth Ave, Ste 1401 #7435, Pittsburgh, PA 15222. All funds spent within the Commonwealth.
Project Mission
prietary clean-energy products. Convert lab-level designs into production-ready prototypes, create local technical jobs, and position HETC to supply pilots to PA customers including homes, small industries, and public facilities.
Project Mission
• Build Activation/QC Bed QAP-90
• Fabricate 20–30 FluxSolar™ panels
• Build 10–15 Quartz Resonant Battery™ modules
• 4–6 local technical jobs created
• Train Pennsylvania technicians/assemblers
• Document scalable manufacturing SOPs
Innovation
Proprietary Technologies
FluxSolar™
Key Features
Multi-Source Harvesting
Solar + thermal + vibrational energy capture
24/7 Operation
Works in night, rain, snow, and low-irradiance conditions
QAP-90 Activated
Every panel standardized through proprietary QC bed
Production Target: 20–30 units for field deployment
Key Features
Multi-Source Harvesting
Solar + thermal + vibrational energy capture
24/7 Operation
Works in night, rain, snow, and low-irradiance conditions
QAP-90 Activated
Every panel standardized through proprietary QC bed
Production Target: 20–30 units for field deployment
GERA
Key Features
Resonance Technology
Quartz-based energy storage with advanced resonance activation
Non-Toxic Materials
No lithium, fully U.S.-fabricable components
Validated Performance
Charging, cycling, and environmental testing
Production Target: 10–15 modules for integration testing
Key Features
Resonance Technology
Quartz-based energy storage with advanced resonance activation
Non-Toxic Materials
No lithium, fully U.S.-fabricable components
Validated Performance
Charging, cycling, and environmental testing
Production Target: 10–15 modules for integration testing
Patent Protected: Provisional patent application #63/907,831 for ResoSolar panel
Economic Impact
Pennsylvania First
Creating advanced manufacturing capacity, local jobs, and sustainable
supply chains within the Commonwealth
Technical positions in PA
FluxSolar™ 24/7 units
GERA units tested
All funds in-state
Complete export-ready manufacturing SOP package
Community Benefits
Advanced Manufacturing
Advanced Manufacturing
city in Pittsburgh region
Supply Chain Growth
Supply Chain Growth
Energy Resilience
Energy Resilience
Workforce Development
Workforce Development
Fund Allocation
Equipment & Tooling
Activation/QC bed, test benches, manufacturing tools
40%
Equipment & Tooling
Activation/QC bed, test benches, manufacturingools
40%
Materials & Prototypes
Aluminum, copper, quartz, piezo, electronics
25%
Personnel
Technicians, assemblers, manufacturing engineer
25%
Materials & Prototypes
Aluminum, copper, quartz, piezo, electronics
25%
Admin & Compliance
Insurance, utilities, reporting, accounting
10%
Personnel
Technicians, assemblers, manufacturing engineer
25%
Admin & Compliance
Insurance, utilities, reporting, accounting
10%
Project Timeline
9-Month Roadmap
Months 1–2 Foundation
▪ Order equipment and materials
▪ Complete activation bed build
▪ Set up manufacturing space
▪ Initial equipment testing
▪ Set up manufacturing space ▪ Initial equipment testing
Months 3–4 Production Launch
▪ Refine standard operating procedures
▪ Assemble first FluxSolar panels
▪ Run QAP-90 activation tests
▪ Quality assurance validation
▪ Run QAP-90 activation tests ▪ Quality assurance validation
Months 5–6 Battery Integration
▪ Build Quartz Battery Modules
▪ Integrate panel + battery systems
▪ Environmental testing protocols
▪ Integrate panel + battery systems ▪ Environmental testing protocols
Months 7–9 Field Deployment
▪ Real-world data collection
▪ Performance monitoring
▪ Final report to DCED
▪ Performance monitoring ▪ Final report to DCED